top of page

Orosi Valley, Costa Rica
Pondorosi
CONSTRUCTION
DECEMBER 2007 VIDEO
Construction began in November 2007. Here is some video I collected from December 2007
FEBRUARY 2008 GALLERY
Framed walls and roof trusses and installed roof.

1.jpg

2.jpg

3.jpg

4.jpg

5.jpg

6.jpg

7.jpg

8.jpg

A.jpg

B.jpg

D.jpg

E.jpg

F.jpg

H.jpg

I.jpg
APRIL 2008 GALLERY
Installed wallboard and siding.

pool drawing.jpg

long pool drawing.jpg

varnish not as dark as it looks.jpg

studio closet.jpg

satin polyurethane marine varnish.jpg

not deep enough for appliances.jpg

neighbors new fence.jpg

kitchen.jpg

Iron railing dimensions.jpg

Planta update April 13.jpg

green blue caramel.jpg

entry facade.jpg

CIMG2703.JPG

CIMG2702.JPG

CIMG2673.JPG

satin polyurethane marine varnish.jpg

pool.jpg

pool drawing.jpg

Planta update April 13.jpg

Planta update April 12.jpg

long pool drawing 2.jpg

little window.jpg

little roof over door.jpg

Veranda with ditch.jpg
JUNE 2008 GALLERY
Added windows and tile.

Through the House

Studio

Studio rear

Studio exterior

Servedumbre (access road)

Rear Entrance exterior

Precinta (fascia)

Office exterior

Kuko and Diego in Great Room

Kitchen

Kitchen window view

Green Bathroom

Great Room tilework

Great Room exterior

Great Room and Fireplace

From north at Tom's house

From El Sitio Road

From Calle Gavilan above

Foyer

First Bedroom

Entry

Eaves

Covered patio

Breakfast Bar

Blue Bathroom

Blue Bathroom original vanity
bottom of page